EZ-ACCESS PATHWAY 3G Aluminum Wheelchair Ramp Kits for Homes
- Free shipping, delivered in 3 to 5 days
- Straight, L-shaped and switchback ramp kits
- 1,000 lb capacity, 36-inch usable width
- Rust-proof aluminum with lifetime residential warranty
Quick answer: To build a wheelchair ramp, measure the total rise, allow 1 foot of ramp per inch of rise (a 1:12 slope), plan 60-inch level landings at the top, bottom and every turn, and check local permit rules. Then assemble a modular aluminum kit on adjustable legs, or frame a wooden ramp on concrete footings.
By Eric Jungersen, President of Express Ramps, a wheelchair ramp retailer since 1999. Updated November 2, 2026.
Whether you call it a wheelchair ramp or a handicap ramp, the planning is the same. A safe ramp depends on getting the slope, width and landings right before you buy a single part. This guide covers that plan, then walks through both ways to build: a modular aluminum kit and a wooden ramp from scratch.

Private homes usually do not have to meet the ADA, but most contractors and inspectors use these numbers as the safety standard. Your local code still decides what is required, so read our residential ramp code guide too.
| Item | ADA standard |
|---|---|
| Slope | 1:12 maximum, or 1 inch of rise per 12 inches of ramp |
| Rise per run | 30 inches maximum, then a level landing |
| Clear width | 36 inches minimum, measured between handrails |
| Top and bottom landings | Level, at least 60 inches long and as wide as the ramp |
| Landings at a turn | At least 60 x 60 inches clear |
| Handrails | Both sides when the rise is over 6 inches, 34 to 38 inches high |
| Edge protection | A curb or rail along the sides so wheels cannot roll off |
Source: U.S. Access Board guide to ramps and curb ramps. The standard has more detail and exceptions.
| Modular aluminum kit | Wooden ramp | |
|---|---|---|
| Typical cost | From $1,000 for a complete kit | About $2,000 to $10,000 or more when contractor built |
| Build time | A straight kit in as little as 30 minutes; most L-shaped and switchback ramps in a few hours with two people | Usually several days on site |
| Support | Adjustable legs; no concrete in most installations | Concrete footings usually required |
| Upkeep | Occasional sweeping and a bolt check | Sealing, staining, board and fastener replacement |
| When needs change | Add, remove or rearrange sections, or resell it | Usually demolished |
See the full wood vs aluminum cost comparison for the numbers behind this table.
These steps follow the assembly order for an EZ-ACCESS PATHWAY 3G ramp kit. They are an overview, so follow the full assembly manual for your layout, including every torque value and warning.
Tools the manual typically calls for: 1/2, 9/16 and 5/16 inch sockets or wrenches, power drill with 1/8 and 5/16 inch bits, 5/32 and 3/16 inch Allen wrenches, #2 Phillips screwdriver, pliers, level, 25-foot tape measure, rubber mallet, hammer, box knife, file and construction adhesive. Add a 1/4 inch masonry bit if you are anchoring to concrete.
Know when to get help. The PATHWAY 3G manual says the system must be installed by a qualified installer. If you are not confident reading the manual, using the tools or judging the ground, hire a contractor or handyman. Nobody should walk on the ramp until assembly is complete. Walking surfaces over 36 inches high need angle braces, and over 72 inches need cross braces as well. In high-wind or seismic areas, ask about the tie down kit, since local code may need engineered anchoring.
Most homeowners hire a contractor for a residential wood wheelchair ramp, because it is a structure that must carry a person and a heavy chair for years. This is the usual sequence, not a set of engineered plans. Have your design approved by your building department before you start.
Many homeowners with basic construction skills can assemble a modular kit, though the PATHWAY 3G manual calls for a qualified installer. A wooden ramp is a bigger job, involving footings and framing, and most people hire a contractor. Check local permit rules either way.
Add up the step heights. Three 7-inch steps make a 21-inch rise, which needs about 21 feet of ramp at a 1:12 slope, plus landings.
Treat the steps as one total rise. Build a level landing at the top, then run the ramp away from the door on its own legs or posts, turning it if needed. Do not rest the ramp on the stair treads.
ADA standards call for at least 36 inches of clear width between handrails. Local codes may differ, and a wider ramp may suit larger scooters.
The ADA maximum is 1:12, or about 4.8 degrees. Always stay within the slope limit in your wheelchair or scooter manual.
Yes. ADA standards call for level landings at the top and bottom of each run, at every change in direction, and after every 30 inches of rise.
Often, especially for a permanent wooden or concrete ramp. Modular aluminum ramps are often treated as temporary medical equipment, but rules vary, so check with your local building department.
A contractor-built wooden ramp usually runs about $2,000 to $10,000 or more. PATHWAY 3G aluminum kits start at $1,000 with free shipping to the contiguous U.S. The total depends on length and platforms.
Original Medicare generally does not. Some Medicare Advantage plans, Medicaid waivers, VA benefits and state programs may help. See our guide to ramp costs and financing.
This guide is general information, not engineering or legal advice. Requirements vary by location, so confirm them with your local building department, and always follow the manufacturer's instructions.
Send us your rise and a photo of your entry, and a ramp specialist will help you size a layout. Call 866-491-1110, try the Ramp Wizard, or shop wheelchair ramp kits for homes.